The recently completed Lower Northwest Interceptor Program (LNWI) in Sacramento, California comprises, ten pairs of microtunnels totaling 14,417 ft, three horizontal directionally drilled bores totaling 3,154 ft, and two large diameter tunnels under the Sacramento River totaling 3,953 ft. This paper describes the problems encountered with each trenchless crossing, as well as lessons learned with respect to shaft construction, ground control at shafts during tunnel break-in and break-out, frac-out and heave, settlement, obstructions, coordination with permitting agencies, and application of geotechnical baseline reports.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.