Abstract

Theory is fine, but practical experience is the heart of real learning. This chapter provides—as much as a book can—some real-life experience through seven case histories of how wastes are managed. The case histories describe a state-of-the-art materials recycling facility, five waste disposal facilities in three different countries (the United States, Canada, and Sweden), and a large mass-burn incinerator. Choosing which of the many thousands of landfills in existence to include was a difficult task. Three municipal solid waste landfills are described. The first, Fresh Kills landfill in New York City, was constructed in 1948 and represents older landfill technology. The second, a new landfill in East Carbon County, Utah, was built in 1992 and incorporates the latest engineered barriers and features of a modern landfill. The third is being developed in a large, abandoned open-pit mine in California. In addition, we discuss a landfill and treatment center for hazardous waste, located in Swan Hills, Alberta. A unique Swedish facility for disposing radioactive wastes rounds out the suite of landfill case histories; this facility takes a very innovative approach to waste disposal and is included to provide a different perspective on this topic. Materials recovery facilities (MRFs) are the vital heart of modern integrated municipal waste management systems. Without MRFs, recycling on any practical scale would not be possible; it is here that recyclable materials are collected and made ready for sale to secondary markets. One of the most innovative recycle centers in North America has recently been constructed in the city of Guelph in southern Ontario (Guelph, n,d.). It offers good insight into what can be achieved through recycling, and the equipment that is involved. The city of Guelph, with a population of 95,000, is situated about 60 kilometers west of Toronto. In the mid-1980s, the city began studying ways to reduce the amount of waste being placed in its landfill. These studies received a major impetus in 1991, when the province of Ontario developed a waste reduction plan that required municipalities to reduce the amount of garbage being placed in landfills by 50% by the year 2000. A number of pilot studies were conducted before the present approach was selected.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.