Abstract

This article, based on ethnographic fieldwork in 2016–2019, examines methane extraction operations in Lake Kivu on the Rwanda/DRC border as a lens into understanding how energy futures in Africa are imagined and enacted within national projects of post-war reconstruction. In 2005, scientists suggested that the lake’s dissolved methane risked oversaturation within the century. This spurred state-backed projects to simultaneously prevent a natural disaster and harness the methane to meet Rwanda’s rising electrification needs. Two companies are currently building and operating methane-fuelled power plants. The article suggests that these energy projects, an integral part of the overall architecture of social repair in Rwanda, reproduce and generate forms of captivity and entrapment that are central to understanding the lived politics of ‘carceral repair’, a generation after genocide.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.