Abstract
The purpose of this document is to describe the results of the soil decontamination demonstration conducted at the Fernald Environmental Management Project (FEMP) site by the Fernald Environmental Restoration and Management Corporation (FERMCO) and the Oak Ridge National Laboratory (ORNL). This demonstration, which began in November 1993 and ended in October 1994, involved the removal of uranium from contaminated soil sampled from two FEMP sites. The demonstration was conducted so as to meet the requirements of the Fernald Site Integrated Demonstration program, as well as all environmental, safety, and health requirements of the site.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.