Abstract

Road network maintenance scheduling mainly considers budget limits in the previous studies and largely ignores the capital constraints. This study proposes a bi-objective mixed integer programming model, in which the net present value (NPV) is maximized and the increased total system travel time (ITSTT) due to maintenance activities under the capital constraints is minimized. Since the road network flows cannot reach an equilibrium state overnight due to the variation of network capacity, a link-based day-to-day dynamics model is developed to simulate the transient fluctuation in the traffic flows and calculate the total system travel time of each day. The bi-objective model is solved by the nondominated sorting genetic algorithm-II (NSGA-II) that generates a set of optimal Pareto solutions. The TOPSIS method is then adopted to determine the best compromise solution. Finally, a case study is conducted to demonstrate the effects of key parameters on the values of the two objectives.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.