Abstract

Focused on bus station at upstream, this paper improves the bus blockage adjustment factor calculating model of Highway Capacity Manual 2010 to estimate the capacity of signalized intersection, in which three kinds of land-use of the bus loading lane considered. Furthermore, we deducted factors and its sensitivity analysis about the impact on the capacity due to the bus station. Finally, we conclude that distance between the bus station and intersection stop line, and the arrival rate of the bus loading lane are two important factors affecting the signalized intersection capacity. So to accommodate queue vehicles arrived during red time, distance between the bus station and intersection stop line should be long enough.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.