Abstract
A capacity planning system (CPS) that considers the capacity and capability of equipment is developed for multiple semiconductor manufacturing fabs. On the basis of pull philosophy and the assumption of infinite equipment capacity, the system determines each lot's release time, start fab, and the capability of the equipment. CPS includes three main modules-the WIP-Pulling Module (WPM), the Workload Accumulation Module (WAM) and the Wafer Release Module (WRM). WPM pulls WIP from the end of the process route to meet the master production schedule (MPS). WAM then calculates the expected equipment loading in different time buckets. If WIP cannot meet the MPS requirement, then for each lot to be released, WRM evaluates the expected loading of many fabs, based on the lot's planned start time, and then determines the lot release time, the start fab and the equipment capability, to optimize the workload balance among all fabs. Simulation results indicate the effectiveness and efficiency of this system. A CPS that combines Adjusted Release Time (ART) and Path Load performs best in terms of three performance measures. This finding shows that CPS based on the combination of ART and Path Load can efficiently balance the equipment workload among the various fabs, on various days, and across various equipment at various levels of demands.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.