Abstract

The focus of this study is on tactical-level capacity management which refers to the determination of in-house workforce production capacity in an optimal cost-efficient manner in a multi-period mode. Two options for capacity planning are investigated for rapid prototyping with the help of a mixed-integer linear optimisation model: smoothing the capacity utilisation over time vs. a higher level of capacity availability. A sensitivity analysis based on real empirical data in Siemens AG is used for the revealing the impact of workforce and capacity flexibility on operational performance. The results suggest that the number of workers decreases if production orders have not to be completed within only one week. On the contrary, if the binary restriction on the order fulfilment within one week is released, the production orders can be split into different weeks and this results in a higher smoothing rate and thus in a higher capacity utilisation degree.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.