Abstract
Time lags in switching operational modes are typical in the manufacturing and power sectors but are not treated in most real options models. In this paper, we consider a firm that has the opportunity to suspend and to resume production infinitely many times subject to a time lag after each startup decision. We contribute to the literature by allowing the firm to determine its level of installed capacity in conjunction with its optimal investment timing. We find that an increase in the length of the time lag results in an increase in the optimal capacity level. Capacity optimization also interacts with the length of the time lag to affect investment timing and the triggers to suspend and resume production, thereby weakening the result about hysteresis from a standard real options model. Under the assumption of a fixed level of capacity, a longer lag speeds up the decision to resume operations due to a positive upside to the revenue but delays the suspension of operations. By contrast, with capacity optimization, a longer time lag results in a larger capacity choice, which can indirectly delay the investment decision and the timing to resume operations. This indirect effect dominates when the level of market uncertainty is low and the time lag is initially small.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.