Abstract
A procedure is presented for the analysis of time phasing of reservoir system development. The formulation is based on a multi-purpose reservoir model with stochastic inflows. The object is to select the reservoir sizing, timing of expansion and to establish operating policies such that the total cost associated with the system of linked reservoirs is minimized. The capacity expansion aspect is formulated as a mixed integer continuous linear programming problem. Due to the resulting problem size and its general structure, Benders' decomposition is applied. A numerical example illustrating the procedure is given.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.