Abstract

This paper presents a multi-nodal intertemporal Cournot gaming model with transmission constraints and uses it to simulate energy-only and capacity-energy market designs in the presence of uncertainties stemming from intermittent renewable power generation. Both market paradigms are compared to a competitive benchmark in order to determine which one performs better in a concentrated market with significant penetration of wind and solar generation. As a specific example, the model is applied to the South Australian zone of the Australian National Electricity Market (NEM). The simulation results for the time interval 2013–2030 show that the capacity-energy market has the potential to induce significant new capacity and push prices much closer to the competitive level in contrast to the current energy-only market design.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.