Abstract

The disassembly process in remanufacturing has attracted increasing attention in recent years due to the high importance of environmental issues. The paper studies a capacitated single-item multi-period disassembly scheduling problem with random yields and demands in which procured, returned items (root items) are disassembled into components or parts (leaf items) to satisfy their demands in each period. The problem is formulated as a mixed integer nonlinear program (MINLP). Notably, a chance constraint is introduced to ensure that the probability of satisfying the demand is greater than a predetermined service level, and then is approximated by a second-order cone constraint. An outer approximation (OA) based solution algorithm is proposed to solve the resulting model. Furthermore, a special case that has uniformly-distributed yield and normally-distributed demand is considered given a closed-form formulation. Extensive numerical experiments demonstrate that the proposed algorithm can achieve converged optimal solutions within much less CPU time compared with the well-known solver BONMIN. Furthermore, a scheduling process of a valve producer is also conducted to demonstrate the application in practice. In the end, managerial insights are explored and future research directions are outlined.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.