Abstract

This paper aims at investigating the feasibility of four-phase (4P) overhead transmission lines, that could be viewed as a possible alternative to the traditional three-phase (3P) solutions for the construction of new transmission lines. This subject is important especially in the European framework, where expansion and reinforcement of existing transmission systems are increasingly required. This paper performs an economical comparison between innovative 4P transmission lines and traditional 3P lines, with the specific goal of evaluating the contests where a 4P transmission might compete with traditional 3P systems with single or double circuit lines.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.