Abstract

This paper analyzes the impact of a large-scale safety-in-design initiative during the design and construction of a semiconductor manufacturing facility in the Pacific Northwest of the United States. Drawing on multiple data sources including individual interviews, group interviews, construction documentation, and an expert panel involved in the initiative, the writers identify 26 potential design changes on the project and assess the importance of timing, trade contractor involvement, and the type of design change in determining whether a proposed design change was ultimately integrated into the final construction plans. The writers further consider whether adopted design changes would have occurred in the absence of the safety-in-design initiative and whether the accepted design changes ultimately impacted construction site safety on the project. This analysis of a full-scale safety-in-design initiative provides important insights into how injury prevention efforts in the construction industry can begin upstream by involving designers, engineers, and trade contractors in preconstruction processes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.