Abstract
With its excess production capacity reduced to below 20 percent, a water service provider in Pennsylvania is conducting a study to determine whether adjusting filter rates could increase the design capacity of one of its main water treatment plants.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have