Abstract
A calendar time interpolation method for two dimensional amplitude maps is used on real data from the Sleipner CO2 storage project. Interpolation uncertainty increases with the time gap between consecutive seismic surveys and is estimated by leaving a survey out (blind test). Field-life cost of various acquisition systems and repeat frequencies are linked to the time-lapse interpolation errors.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.