Abstract
Based on the method of time-domain upwind difference algorithm, the ground hybrid electric field is calculated. The typical tower is selected from the ±800kV Hami- Zhengzhou DC transmission project and the 750kV Tianshui-Baoji double-loop transmission line project. In the paper, the minimum height above ground is determined when the individual AC and DC lines meet the electric field limits, respectively. Then the article analyzes the AC and DC parallel spacing and the width of the corridor, using the weighted method to determine the control values of hybrid electric field.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.