Abstract

In order to set up a queuing theory model and propose an improved method of capacity calculation, the existing equipment of loading station, railway line situation and technological processes were analyzed, then each operation time was determined in this paper. And queuing system of Nanping Station was taken for example. Based on the system structure and operations of the loading station analysis, a survey of the event flows of the arrivals and services in subsystems to derive the queue parameters of queuing subsystem was made. At last, the system capacity of the loading station was calculated out.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.