Abstract

Hongdu Bridge is an extraordinarily huge bride across northern branch Ganjiang River, in the city of Nanchang. Main tower adopted single column slanted pylon space twist face back cable structure. Its construction is based on double-wall cofferdam method. The paper discuss thecalculation of key step and key position for the key technology in terms of double-wall cofferdam and platform underwater construction, Which include the design of the base construction and double-wall cofferdam,steel cofferdam construction, the calculation and checking of the cofferdam and so on. The whole length of 9.5 km, except the starting period of about 2.4 km for roadbed type, the other sections of approximately 7 km. The project always invests about 18 Billion yuan.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.