Abstract

The calculation of the reliability at the PLTU Anggrek 2×25 MW Gorontalo obtained a LOLP value of 61.5 days/year. This value was still above the standardreliability value of PLN, this was due to the occurrence of PO (Planned Outage) and MO (Maintenance Outage) in unit 2 in June-July 2021, namely in theform of the first-year inspection in July. The FOR (Force Outage Rate) value was calculated based on the disturbance data from the generator in 2021. Thedaily load value was obtained from the load forecast value in January-July using FIS (Fuzzy Inference System) Mamdani type using the Matlab Toolbox. Theerror value in the proposed load forecast was 8%. The rules that had been compiled were used to predict expenses in August-December 2021. From the resultsof forecasting From the results of forecasting expenses, it was found that the trend of expenses was increasing every month.left with 10-pt Times New Roman bold. The abstract must be contained in one paragraph.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.