Abstract

The calculations presented in this report are performed to obtain seepage rates into drift and boreholes for two alternative designs of drift and waste emplacement at Yucca Mountain. The two designs are defined according to the Scope of Work 14012021M1, activity 399621, drafted October 6, 1998, and further refined in a conference telephone call on October 13, 1998, between Mark Balady, Jim Blink, Rob Howard and Chin-Fu Tsang. The 2 designs considered are: (1) Design A--Horizontal boreholes 1.0 m in diameter on both sides of the drift, with each borehole 8 m long and inclined to the drift axis by 30 degrees. The pillar between boreholes, measured parallel to the drift axis, is 3.3 m. In the current calculations, a simplified model of an isolated horizontal borehole 8 m long will be simulated. The horizontal borehole will be located in a heterogeneous fracture continuum representing the repository layer. Three different realizations will be taken from the heterogeneous field, representing three different locations in the rock. Seepage for each realization is calculated as a function of the percolation flux. Design B--Vertical boreholes, 1.0 m in diameter and 8.0 m deep, drilled from the bottom of an excavated 8.0 m diameter drift. Again, the drift with the vertical borehole will be assumed to be located in a heterogeneous fracture continuum, representing the rock at the repository horizon. Two realizations are considered, and seepage is calculated for the 8-m drift with and without the vertical 1-m borehole at its bottom.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call