Abstract

The open pit mining method of solid minerals extracting is widely used both in Russia and in the whole world, and sets a general direction of mining industry development as its main tool, at least for the next decades. This is due to its significant advantages compared with other methods of minerals extraction, especially with underground method. This conclusion is made considering production capacity of mining and enrichment enterprises, mining safety, productivity and working conditions, investment and operating costs, level of mechanization, automation, robotization, informatization and computerization of production, full use of mineral resources. However, the practical realization of these advantages of the open pit method of mining, neutralization and reduction or elimination of its shortcomings (environmental damage) requires thorough and reliable design solutions, their timely and accurate adjustment, application of scientific methods and modern technical and technological means. This is especially important and relevant for design, construction, operation, reconstruction and reclamation of open pits developing complex and large deposits of scarce and valuable mineral resources. Erroneous and insufficiently substantiated design solutions and their implementation lead to a significant decrease in the efficiency of open pit mining.

Highlights

  • At open pit mining, it is easier to follow the changing form of deposits

  • A very common criterion for the calculation is the maximum profit in the development of the field

  • Gorodetsky successfully developed the idea of maximum profit in the development of the mineral field by the combined method

Read more

Summary

Introduction

At open pit mining (as compared to underground mining), it is easier to follow the changing form of deposits. This fact gives more opportunities for selective extracting and averaging the quality of commercial mineral products, i.e. there are more opportunities for the full use of the wealth of mineral resources [1,2,3,4]. It is possible to build an open pit mine with predetermined main parameters of the quarry field [5]. We propose to take into account the risks and errors in the calculation methods for assessing the main parameters of the quarry

Methods
Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.