Abstract

This paper introduces the calculation method and results of the large-fluctuation transition process of the Francis hydro-generator set. The operation of the power station shows that the calculation method and results can meet the engineering requirements, but they cannot reflect the state of the unit during small fluctuations. For large-scale units, this problem needs to be addressed and further research.