Abstract

In recent years, with the energy transformation and the continuous innovation of new energy technology, the installed capacity of new energy continues to increase, the high proportion of new energy access increases the peak pressure of the power grid, but also increases the possibility of de-electric power. As a key solution, energy storage and wind power and other new energy in-depth integration, can effectively improve the power grid adjustment capacity, to ensure the benefits of new energy generation. Using the time series production simulation method, aiming at the utilization rate of new energy, this paper calculates the principle of energy storage configuration in different regions of Shanxi Province, and provides theoretical support for the analysis of energy storage configuration in Shanxi Province.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.