Abstract
The synthetic efficiency of hydroturbine is the foundation and important basis of economic operation of hydropower plants. However, the traditional calculation methods have large amount of calculation, large errors and other problems. To solve the problems better, this paper introduces the Elman neural network and BP neural network to calculate the synthetic efficiency of hydroturbine. Comparing the results of the Elman neural network and the traditional BP neural network, the result shows that, Elman neural network is an effective way to improve the learning speed, effectively suppress the minimum defects that the traditional neural network is easily trapped in, and reduce the error. The result suggests that the Elman neural network has better nonlinear mapping capability than the BP neural network.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.