Abstract

Abstract Calcium looping (CaL) systems have been proposed as a lower-cost method of CO2 capture for power plants. This paper presents the results of a techno-economic assessment of a CaL system for post-combustion CO2 capture at a pulverized coal (PC) power plant. Comparisons are made with a conventional MEA-based CO2 capture process in terms of performance and cost. Considering the significant quantities of solid flows required for a CaL process, the applicability and operational feasibility of a CaL system for new or existing PC power plants also is studied. It was found that though the CaL system has better performance than the MEA-based CO2 capture process, the capital cost of the power plant and the cost of electricity is much higher than when the MEA-based system is used.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.