Abstract
This paper presents the problems encountered in the underground medium-voltage distribution system at a large manufacturing facility of Western Electric Company, Inc. Three inservice faults and subsequent test failures were experienced within a 5-month period in 1963. A dc overpotential test program was initiated, as a result of which, the decision was made to replace the entire underground system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IEEE Transactions on Industry and General Applications
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.