Abstract
The Advanced Humid Air Turbine (AHAT) system improves the gas turbine thermal efficiency by using high-humidity air without needing a high firing temperature and pressure ratio. A system verification plant that consists of a gas turbine generator (two-stage radial compressor with pressure ratio 8, two-stage axial turbine, single-can combustor), recuperator, humidification tower, water recovery system, and other components was constructed to validate performance of AHAT system. The verification test has been begun since October 2006. The test results showed good performance such as thermal efficiency over 40 %(LHV) and NOx emissions less than 10 ppm.
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: The Proceedings of the National Symposium on Power and Energy Systems
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.