Abstract

"Research Committee on application of new findings and technology to improve pipe-wall-thinning management" was established on April, 2010 after concluding the previous phase, "Research Committee on basic technology to improve pipe-wall-thinning management", and the activity will continue for two years. The objective of the research committee is to investigate new R&D studies in the world in order to improve the management due to revise and/or enhancement of the pipe wall thinning management rules of JSME. Researches for improving the management in the plant, the evaluation methods of flow accelerated corrosion and liquid droplet impingement erosion, inspection and monitoring methods of pipe wall thickness, criterion of pipe wall thinning from material strength, and evaluation methods of pipe wall thinning rate from the inspection data were investigated.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.