Abstract

Aiming at solving the problem that the moving route is complicated and the scheduling is difficult in the routing buffer of the bus in the manufacturing workshop, a routing buffer mathematical programming model for bus manufacturing workshop is proposed. We design a moving approach for minimising the total setup cost for moving in routing buffer. The framework and the solution of the optimisation problem of such a bus manufacturing workshop scheduling with routing buffer are presented. The evaluation results show that, compared with the irregularly guided moving method, the proposed method can provide a better guide line for the bus movement in the routing buffer by reducing the total setup time of all buses processed at the next stage, and a better scheduling optimisation solution with minimise maximum total completion time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.