Abstract
The California Department of Transportation is studying ways to increase the use of the urban freeway systems that will accommodate the maximum number of people with the least delay and the maximum possible safety in a cost-effective way. This paper describes operational features of four different projects under way, namely: a contraflow bus lane; a part-time bus lane in the same direction and unseparated from normal traffic; a bus-carpool lane also in the same direction and unseparated from normal traffic; and a preferential access to a metered freeway. (MCW)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.