Abstract

Abstract The present paper describes a technical-economic analysis of thermomodernization works in multifamily buildings and public utility facilities constructed with the use of both traditional and industrialized technologies (prefabricated large-panel concrete, Zeranska brick), built before 1990. 1441 buildings located in 7 towns were analysed. The energy consumption indicator of the buildings undergoing the analysis was the indicator of heat load demand per cubic capacity, which was established on the basis of site inspections and technical documentation. The obtained results were used in analysing the cost-effectiveness of the suggested thermomodernization works. The following were adopted as criteria of the investment effectiveness: the ‘Simple Pay Back Time’ (SPBT), reducing the amounts of particulate matter and sulphur dioxide polluting the air, and heat load saving (amounting to a few or even several megawatts, which, in the case of a small town, is often sufficient to cover a prospective increase in heat load demand).

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.