Abstract
In order to accurately analyze the building energy consumption and identify the problem of building energy consumption in advance, this study carries out the energy consumption analysis based on BIM (Building Information Modeling). The research object is a four-story college student dormitory in Beijing, and this set of BIM-based energy consumption simulation data was obtained using standard operating procedures (SOP). This operating procedure can start energy consumption analysis in the conceptual design stage, and developers can participate in real-time through the use of a three-dimensional information model, without additional design required. Then, comparing this study with the traditional energy consumption analysis, we see that the SOP of this research result has the following advantages: SOP function analysis is more professional, and the visual display method is more popular and intuitive; due to the flexible file format of the SOP, when data exchange is required between different software, the SOP can realize more convenient operation, and users can identify problems in the early stage of design through the SOP, correcting the scheme according to the simulation results, which is conducive to the development of the construction process. Finally, this study puts forward the analysis and estimation of energy consumption in different stages of the building life cycle, so as to provide researchers with ideas for improvement.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.