Abstract

In large buildings, an HVAC system established for the purpose of cooling consumes around 60% of the overall energy requirements.The purpose of this research is to determine the cooling load based on the local climate. A building with dimensions of 17 m x 13 m x 3.5 m was taken as a case study. In this research, The CLTD/CLF method is used to calculate the cooling loads. On the basis of the MATLAB V.2014b program, the appropriate codes were written. Meteonorm version 8.0.3 was used to collect detailed local climate data for an average of 20 years. the results showed that the high load occurs in August and July, respectively. The peak cooling load for August was on the 19th of August, which was 49.22 kW, and the peak cooling load for July was on the 21st of July, which was 46.4 kW.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.