Abstract

By researching the status quo of the project management objectives (quality, schedule and cost) at present, it is found that safety, green and risk management goals are neglected which are important part of project management objectives system. Considering the six objectives and monitoring systems synthetically and using Multi-barrel model, Project Regulation Objective System is constructed to improve the overall quality of project and achieve optimal management. Taking Xi-Tong highway as the research object, verify science of this model, and the results of application of the whole project show that Project Regulation Objective System constituted by quality, schedule, cost, safety, green and risk regulation objective and monitoring systems is effective and science. As the expanding of construction market in China, research on project management theory and project practice continues deepening, and research on quality, schedule, cost three management objectives has been relatively mature. Present, three management objectives have been unable to meet the society requirements due to increasingly heavy construction tasks, constantly expanded projects, increasingly stringent green requirements, increasing project risk and increasingly high requirements of integrated management level. Therefore, in order to achieve scientific, standardized and optimal project management and build a sound project management system, Project Management Objective System should be added safety, green, risk management objective. This study analyzes the limitations of three traditional management objectives and complements the safety, green, risk management objectives in Project Management Objective System. In addition, the implements of six management objectives need corresponding monitoring systems, so six management objectives correspond to the six regulation objectives. Therefore, this study analyzes the relationship among the six regulation objectives and build Project Regulation Objective System based on Multi-barrel Model which includes project management system and monitoring systems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.