Abstract

PT Lill Hajj Wall Umrah is targeted to get 5,226 consumers per year or equivalent to 436 people per month by 2030. The old office in the form of a shophouse with a building area of 119.75 m² for a capacity of 99 people is considered inadequate to serve 436 consumers per month, so PT Lill Hajj Wall Umrah needs a new office with a meeting room of at least 523.2 m². A new office will be planned based on SNI 2847-2019, SNI 1726-2019, SNI 1727-2020, and PBI 1983. The planning results are in the form of an analysis of the new office structure with building dimensions of 28.30 x 23.35m, four floors with a building area of 4,503 m². The material specifications of the building structure are concrete quality (fc') 41.5 MPa, melted reinforcing steel quality (fy) 400 MPa (BJTS), and 280 MPa (BJTP). Basement floor column dimensions 0.6 x 0.6 m, first to fourth floor columns 0.5 x 0.6 m, rooftop columns 0.4 x 0.4 m, main beam dimensions 0.25 x 0.35 m, child beams 0.25x0.5 m, stair beams 0.25 x 0.35 m, roof deck beams 0.25 x 0.3 m and 0.3 x 0.4 m, concrete slab thickness 0.15 m. The results of structural modeling using the Etabs application showed that there was no over-strength (O/S) in the column and beam structure elements. The results of the design of the new office building Lill Hajj Wall Umrah in the form of a basement floor equipped with prayer room facilities covering an area of 14 m2, a generator room covering an area of 15.28 m2, a pump room covering an area of 15.28 m2, parking covering an area of 781.53 m2. The first floor is equipped with VIP room facilities covering an area of 33.33 m2, a prayer room covering an area of 25.87 m2, a toilet covering an area of 44.93 m2, and a boutique room covering an area of 55.22 m2, and a warehouse covering an area of 12.3 m2. The second floor is equipped with a meeting room covering an area of 47.9 m2, a manager's room covering an area of 36.7 m2, a toilet covering an area of 30.9 m2, a prayer room covering an area of 16.08 m2, a boardroom covering an area of 80.59 m2 and a waiting room covering an area of 45 m2. The third and fourth floors are equipped with toilets covering an area of 25.75 m2, a prayer room covering an area of 23.95 m2, and a ballroom of 383.75 m2. The estimated budget for the construction of lill Hajj Wall Umrah's new office is Rp 7.612.645.721.- and takes 406 working days for construction.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call