Abstract

In construction stage, a large buffeting response would endanger construction safety and quality for a long span concrete-filled steel tube (CFST) arch bridge. Developing the study on buffeting security is indispensable to CFST arch bridge in construction stage. Combining random vibration analysis of structure with modern probability theory, taking an actual large span CFST arch bridge as example, dynamic reliability of buffeting responses research and analysis is developed, which is based on the buffeting analysis on time domain at the longest cantilever construction stage. The paper gives quantitative valuation on wind-vibration safety performance of the bridge in construction phase and offers a new thought and reference for homologous project.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.