Abstract
We consider buffer management of unit packets with deadlines for a multi-port device with reconfiguration overhead. The goal is to maximize the throughput of the device, i.e., the number of packets delivered by their deadline. For a single port or with free reconfiguration, the problem reduces to the well-known packets scheduling problem, where the celebrated earliest-deadline-first (EDF) strategy is optimal 1-competitive. However, EDF is not 1-competitive when there is a reconfiguration overhead. We design an online algorithm that achieves a competitive ratio of 1−o(1) when the ratio between the minimum laxity of the packets and the number of ports tends to infinity. This is one of the rare cases where one can design an almost 1-competitive algorithm. One ingredient of our analysis, which may be interesting on its own right, is a perturbation theorem on EDF for the classical packets scheduling problem. Specifically, we show that a small perturbation in the release and deadline times cannot significantly degrade the optimal throughput. This implies that EDF is robust in the sense that its throughput is close to the optimum even when the deadlines are not precisely known.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.