Abstract

Factors causing damage to the metal of the drums of high-pressure boilers, as well as the known cases of drum failures, are analyzed. The totality of factors determining the operational reliability of drums is systematized. The process-related mechanism governing the destruction of the drums at the Kurgan cogeneration station and TETs-3 Yaroslavl cogeneration station, and the general factors caused these drums to fail are identified. Recommendations for reducing the risk of drum failures are formulated.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call