Abstract

In the Bridge project, design and analysis include two main components: preliminary design and detailed design, to integrate Building Information Modeling (BIM) in the design process of the Bridge. Firstly 3D modelling of the Bridge needs to be carried out, that means. It has transferred 2D drawing into 3D models. The BIM mainly focuses on modelling analysis, detection and feedback and design. Cantilever bridge construction is a step-by-step construction of a cantilever in segments and stitching them to segments previously casted by prestressing. When the cantilever segments are added to both sides of the pier, the bending moment in Bridge is negative & increases with the addition of each segment. While key blocks are added, the Bridge is converted from cantilever form to continuous form & the negative bending moment on the pier decreases. In this project, a bridge model of span 130 m has been designed and analysed in midas civil to observe the rate of change of Bending moment, reactions and deflections at different stages of construction in construction sequence and Service conditions.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call