Abstract

ABSTRACT The Brent Field, with two separate reservoirs being developed simultaneously by common facilities and with variable PVT fluid properties and rich condensate gas caps, presents many challenges to the reservoir engineer. This paper describes 3-D simulation studies of the whole field which have confirmed the basic plan for a pressure maintenance development by water injection.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call