Abstract

Since 2004, the Government of Brazil (GoB) has acted as an intermediary between distribution and generator companies in the energy procurement sector. The GoB procures energy from generator companies through auctions of long-term energy contracts. After an auction, the winning generator companies sign contracts directly with distribution companies. In particular, the GoB runs two different auctions: one for energy from existing power plants (i.e., old energy) and another for energy from power plants that have not yet been built (i.e., new energy). This paper describes these auctions and compares the outcomes from the old and new energy auctions from 2004 to 2010 using final auction prices. The Brazilian case is particularly interesting, not only because energy is predominantly supplied by hydropower plants but also because new energy auctions reach prices below those for old energy. Therefore, it is likely that it is not necessary to run the two different energy auctions. As a secondary objective, this article analyze whether the Anglo-Dutch hybrid auction model is a better design for electricity procurement in Brazil.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.