Abstract
AbstractWe consider multiprocessor task scheduling problems with dedicated processors. We determine the tight optima localization intervals for different subproblems of the basic problem. Based on the ideas of a computer‐aided technique developed by Sevastianov and Tchernykh for shop scheduling problems, we elaborate a similar method for the multiprocessor task scheduling problem. Our method allows us to find an upper bound for the length of the optimal schedule in terms of natural lower bound. As a byproduct of our results, a family of linear‐time approximation algorithms with a constant ratio performance guarantee is designed for the NP‐hard subproblems of the basic problem, and new polynomially solvable classes of problems are found.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Transactions in Operational Research
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.