Abstract
This paper describes a scheduling support system for plants that produce multiply paper bags. The machine environment in these plants may be described as a flexible flow shop. That is, there are a number of stages in series with a number of machines in parallel at each stage. The jobs have specified shipping dates as well as priorities; their processing times and setup times are known in advance. We developed a five-step algorithm that schedules all the jobs at the various stages. This algorithm has been incorporated in a system, the Bagpak Production Scheduling System (BPSS), which also contains a data base management module and a user interface module. The system has been implemented in two plants, and is used on a regular basis. It has increased considerably the accuracy of the available information regarding the production process. The scheduler, in conjunction with the system, is able to produce better schedules; he now always knows where given performance measures stand. In addition, the available information enables the scheduler to provide better service to customers.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have