Abstract

A stochastic logic network is defined as a connected set of logic and time delay elements. Each of the latter elements has an associated probability distribution describing the nature of that element's delay. When used, for example, in project planning and scheduling, combinations of logic and time delay elements in such networks may represent conditions for the starting of project activities which are themselves represented by time delay elements. It is at present not known how to calculate the probability distributions for the events in such a network. This paper shows how to obtain upper and lower bounds for these probability distributions. The method is not a simulation technique; rather, it is a straightforward computational scheme derived from elementary probability theory. An example is given where the method is applied to a stochastic project scheduling network in which alternative ways exist for carrying out one of the jobs in the network.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.