Abstract

AbstractConsider a PERT network with stochastic activity durations. This paper presents a new method for obtaining probability distributions that bound the exact probability distribution of the project duration from above and below. The expected values of these bounding distributions then furnish lower and upper bounds on the expected project duration. As illustrated by computational experience, these bounds are tighter than those obtained from methods currently in use. The paper concludes by describing similar results for stochastic shortest‐route networks.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.