Abstract

British tunnel-jacking expertise contributed to savings of over US$300 million on the vast project to build Boston's new subterranean highway network. The change from traditional cut-and-cover construction to tunnel jacking in frozen ground enabled three full-size interstate highway tunnels—totalling over 240 m in length—to be built in heavily obstructed ground under the approaches to a busy railway station with no disruption to service. The scale of the work was unprecedented, being several times larger than any tunnel-jacking project previously undertaken. It has set a new benchmark for the technique and further raised its profile as an effective and sustainable solution for creating new urban infrastructure.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.