Abstract
HZB has started building the 50 MeV, 100 mA demonstrator energy-recovery-linac (ERL) facility bERLinPro. The high power injector system needs to deliver this beam at 6.5 MeV by combining the energy gain of a 1.4 cell SRF photo-injector and three Cornell style 2-cell booster cavities. One booster cavity will be operated at zero-crossing for bunch energy chirping. Thus two booster cavities have to deliver 2M Veach requiring a strong coupling with a loaded Q of 10 5 . To house the two envisaged KEK fundamental power couplers (FPC) with the cavity, the geometry was slightly modified. Further, to increase coupling and reduce transverse kick effects to the beam, a ”golf-tee” antenna tip was designed. This paper summarizes the SRF challenges for the booster cavities, the operational conditions and the modification to the KEK couplers, including tracking calculations to estimate the coupler kick effect to higher order.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.