Abstract

In December 1968, the Boeing Company defined a two-phase programme having the objective of demonstrating for the US Army those characteristics which experience with operation of the CH-47 Chinook had indicated would be required in the next generation of US Army transport helicopters. The programme, which was named the Model 347 Programme, would encompass simulation, wind tunnel, whirl tower, and bench testing and culminate with flight test development and demonstration of a modified CH-47A airframe. The first phase of the programme was aimed at establishing new standards for the flying qualities (handling, vibration and noise) of transport helicopters in a conventional pure helicopter arrangement. The second phase was to allow assessment of the value of providing a high manoeuvre capability for a transport helicopter as could be provided through the use of a fixed wing.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.