Abstract
This paper discusses the removal of BOD5 in facultative ponds under tropical conditions. Data was collected from pilot and field ponds at the University of Dar es Salaam and was compared to other ponds in Dar es Salaam. Results showed deviations of performance, in some cases, from assumptions made during the design. The permissible organic loading rate for ponds in Dar es Salaam was 450 kg BOD5/ha/d. To reduce concentration of algae in the final effluent, a sunken outlet structure was suggested.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.